Superload or Heavy Haul Construction Logistics Services

Logistics in Construction Projects

The primary responsibility of the construction site logistics manager is the organization of the trucking logistics company and assigning all the available resources to ensure that all of the agreed-upon delivery dates are met. 

The responsibilities that come with the job span a wide variety of domains, including the following:

Paige Logistics is aiming to be Canada’s leading 3PL in servicing construction industry logistics. Paige Logistics are a crucial working partner in supporting the process of planning, implementing, and controlling the resources along the supply chain by the construction logistics management. 

This process of logistics in construction projects typically begins at the point of origin, such as the accumulation of raw materials. 

Assigning the right truckload trailer type  either a customizable flatbed trailer or wide-load trailers for supersized loads with heavy haul trucking services from the point of collection to the destination, such as the delivery of goods to the appropriate location on a construction site.

It is essential to have efficient construction industry logistics management since it helps improve production and efficiency, which in turn has a beneficial effect on the amount of money and time spent. 

For instance, effective management of logistics for the construction industry means that the workforce is able to carry out needed operations without experiencing delays as a result of goods being warehoused, freight matched with right carrier and transported to the location where they are being utilized.

A crucial component of effective logistics management is having a timetable of the project stages laid out in advance, along with a complete inventory of the essential building supplies, machinery, and tools

Modeling, analyzing, and optimizing logistics may be accomplished with the help of specialized simulation software due to the complexity of the process and the interaction of a great number of supply streams.

In addition to ensuring that the construction project stays on track, the following are some additional benefits that can result from properly managing construction logistics:

Awarded 3rd place Global Ranking

Award winning construction logistics

The process of designing, implementing, and regulating the operations of the supply chain across various sites is referred to as logistics management. 

Efficiency and productivity in construction site logistics planning  may be considerably improved with the application of effective logistics management.

The many activities of construction logistics management involves the integration of:

Sourcing & procurement
100%
Production planning & scheduling
100%
Inventory management & order fulfilment
100%
Inbound & outbound transport management
100%
Materials handling & Warehousing
100%
Waste management
100%

Mobilization

Taking measures to ensure the site’s safety.

-Management of the flow of traffic (wide load, heavy hauler trucking

-The installation of and management of various forms of site accommodation and wellness amenities.

-Ensuring that the location has adequate lighting.

Logistics management for the construction site

– Coordinating communication with the general contractors as well as the subcontractors in line with the program.

-Ensuring that all of the necessary materials are delivered to the location at the appropriate times.

-Ensuring that there is as little waste as possible and that appropriate disposal processes are followed.

Communication and Precautionary Measures

-Ensuring that the health and safety policies of the organization are followed and that they are executed.

-Ensuring that personal protective equipment (PPE) and other forms of safety gear are readily available at the location.

-Generating various documents such as method statements, risk assessments, etc.

-Maintaining firing points and equipment.

– Putting in place and taking care of a system for the conveyance of information throughout the site, such as site signs.

Delivery Management

-Coordinating with the project’s suppliers and overseeing all of the trucking moves to and from the construction site

-The establishment and upkeep of a delivery management system for the construction company.

-Delivery truck use planning and optimization to achieve maximum efficiency.

What exactly is a superload, then?

In general, depending on which state you’re in, a super load, or superload, is when the truck load has wider dimensions than the province or state’s “routine permit limits,” and it is not able to be broken down or divided into smaller parts for shipping. In other words, it can’t be shipped in sections.

Heavy Haul Trucking & Superload 

A super load can go over more than one of these restrictions, or it can merely go over one of these limits, but it will almost always go beyond the usual permit limits for the following categories:

• Weight’s

• Width’s

• Length’s

• Height

Bear in mind that all of this will rely on the rules that are in place in the various provinces of Canada and the United States. When transporting a super load, a carrier must also take into account the fact that obtaining state clearance often takes a great deal more time and may necessitate the following requirements:

• Letter from the Shipper

• Engineering Survey

• Route Survey

• Pilot Cars

• Police Escorts

• Permits

• Utilities Involvement

• Bridge Analysis

• Drawing or Sketch of Shipment

• State Approval • (weeks to months)

It is imperative that prior to hauling, you conduct your research because the location, rules, terms, and conditions of each state and province might differ significantly.

For instance, the state of New York considers any weight that weighs more than 200,000 pounds to be a superload, while the state of Massachusetts considers any load that weighs more than 130,000 pounds to be a superload. Remember that these two states are physically connected by a border with one another.

When it comes to big load carrying, there is a very wide selection of size that you may choose from. If your cargo qualifies as a super load, one state may need that you give them a lead time of two weeks, while another state may ask that you provide them a lead time of months for a far larger super load.

Most of the time, a superload will consist of a number of different components, including jeeps, dollys, stingers, trailers, and boosters. In the case of lift axles, several jurisdictions permit the raising of the axles during turns, even though this might cause damage to tires and roadways and make it more difficult for the driver to complete the turn.

When the states want a drawing for a super load, they are often searching for the following information:

• Axle Loadings

• Axle Spacing

• Tire Size

• Tires per Axle

• and Dimensions

• Axle Loadings

• Axle Spacing

• Tire Size 

It is important to keep in mind that superloads may also be transported by barge or rail, and if one of these modes of transport is an option, it has to be investigated, or an explanation needs to be given as to why it cannot be used.

In conclusion, I will discuss the traffic control strategy and the criteria for a super load, but I will limit my discussion to a quick overview for the purposes of this essay.

• Path

• Traffic Control

• Anticipated Delays in Traffic

• Lane Restrictions

• Escort Vehicles and Flag Persons

• Overhead Hazards (that can also be moved)

• Railroad Crossing Schedules (and minimum ground clearance requirements)

• Navigation for Emergency Vehicles

With a reputable logistics company in Canada like Paige Logistics, you now know the answer! Handling a superload cargo may be a joyful and thrilling experience, but it requires a lot of expertise, knowledge, and the ability to solve problems, to mention a few of the requirements. It is recommended that you photograph Super Load Hauling; thus, you should prepare to do so.

Regulations are not set in stone and are subject to modification. Always make sure you properly look over your permissions and stipulations paperwork.

The correctness of the information that was supplied cannot be guaranteed by our company.

Please let us know if you notice anything that is inaccurate on this page, and we will check it and make the necessary updates. Do you require assistance with shipping into or out of Canada?

Please read our post on the documentation that is necessary to enter the Canadian border.

Ready to Roll ?

Logistics Services for the Construction Site